Monday, March 5, 2012

Turbine Base

Chris jumped on the lathe and machined out the pipe fitting to fit a steel base we found. Tyler sawed the base down to size and prepped it for welding. Spencer stepped in and welded the two together.

The frame continued to be build as well but we are waiting for some images to be sent to us.
 Potential T-Shirt Design!




No comments:

Post a Comment